Al Barari Development Phase 1 Main Villa
General Aviation and Heliport, Dubai World Central Airport, Phase 1A and 1B
This project includes the construction of concrete aprons, taxiways, roads for Ground Support Equipment (GSE), and utilities as part of Phase 1 – Development of Al Maktoum International Airport – Dubai World Central Airport aerodrome and infrastructure at Jebel Ali. Other planned works include the construction of 510,000 m² of the concrete apron and 330,000 m² of taxiways.
The project specification also includes earthworks, rigid walkways for taxiways and GSE, airfield lighting works, and a water network.
Other work includes the development of infrastructure and vehicle parking for the new airshow facility currently under development at Al Maktoum International Airport.
The project specification also includes earthworks, rigid walkways for taxiways and GSE, airfield lighting works, and a water network.
Other work includes the development of infrastructure and vehicle parking for the new airshow facility currently under development at Al Maktoum International Airport.
Dubai International Airport Expansion (Phase Two)
Concourse 3 is an extension, yet an integral part of the ongoing development of Concourses 1 and 2 at Dubai International Airport. Partly underground structure, including Automated People Moving (APM) stations for arrivals and departures, the concourse extends above ground under a metal shell and has space for 20 aircraft stands – 18 of which are designed for the Airbus 380 – and waiting rooms for six other aircraft at remote stands.
Similar to Concourse 2, the building envelope of Concourse 3 shares the same size and shape characteristics. With a floor area of 90 x 645 m on a constructed area of approx. 528,000 m², the building includes Emirates Airline's lounges and hotels as well as the arrivals and departures areas with a duty-free area.
Approximately 1 million m³ of reinforced concrete was poured over a period of two years for this order. It is the largest single contract in Dubai to date to be carried out by AA Construction Group, employing 7,500 people.
Similar to Concourse 2, the building envelope of Concourse 3 shares the same size and shape characteristics. With a floor area of 90 x 645 m on a constructed area of approx. 528,000 m², the building includes Emirates Airline's lounges and hotels as well as the arrivals and departures areas with a duty-free area.
Approximately 1 million m³ of reinforced concrete was poured over a period of two years for this order. It is the largest single contract in Dubai to date to be carried out by AA Construction Group, employing 7,500 people.